josephmarvens2787 josephmarvens2787
  • 04-03-2022
  • Biology
contestada

When was the keystone pipeline scheduled to be completed.

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

2021 - 2022, but the truth is it never got completed.

Answer Link

Otras preguntas

I need help on this please
The release of water vapor from sweat glands when we are not sweating is a process called.
When you see or visit grasslands, what do you know about the climate? (Select all that apply.) They have a lot of precipitation. They have mild to hot summers.
how does mutation cause genetic variation between parents and offspring?
If f(–5) = 0, what are all the factors of the function f (x ) = x cubed minus 19 x + 30? Use the Remainder Theorem.
Asher has been accepted to two good colleges. Both have a program that really interest him, and he can afford either. While they appear to be equal, he really l
Jaylynn could jump rope at a rate of 9 jumps every 4 seconds how many can she complete in 60 seconds
who is the politician who made february black history month in canada
What were both nobles and knights obligated to do? A.)remain loyal to one another B.)protect those who lived on the manor C.)take an oath of chivalry D.)provide
12a +5 identify the coefficient