katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

What is the best unit of measurement for the capisity of a travel size of shampoo
Branson and his sister beatrice combined their allowance of $7 each, so they could buy a movie for $12. They bought $1 containers of fruit salad with the remain
A 160g radioactive sample is left undisturbed for 12.5 hours. At the end of that period, only 5.0g remain. What is the half-life of this sample? Show work
PLEASE HELP ME WITH THESE TWO
—Paco, no _____ nada ahora. Vamos a cenar en 10 minutos. comes (wrong) comas comió come
write three verbal expressions for the following: 6 plus (25÷5).
On a 50 question test a student awncerd 5 questions wrong what percent did he awncer correctly
What is the highest level of discipline faced by a student found guilty of violating the Academic Honesty Policy.
What's the total resistance in a circuit that contains three 60 Ω resistors connected in series?
jay earns $50 per week plus $5.25 fro each hour worked in a given week Fred earnings are calculated using the formula p=6.25(x+8) where x is the number of hours